link to Home Page

Hydroponics/Fish Tanks and Worm Beds Infrastructure

The Headquarters site is a solid old house, but is 100 years old with minimal upgrading done on the plumbing and electrical systems. The President has spent over $3000 to upgrade less than 1/2 the house and basement, and upwards of $900 to upgrade less than 1/2 the plumbing systems. The electric system to support hydroponics, with its lights and pumps and timing devices, and the plumbing system to support hydroponics and worm beds, with their intake and drainage systems, is not in place and would require upgrading. For instance, the side of the basement where these prototypes would be placed has an old Village water intake pipe that is rusted and runs the full length of the basement without any outlets. Based on the recent work done by electrical and plumbing contractors, this would require, to support the prototype demos: